The above poster has been placed on 3rd mainland bridge to notify
motorists of planned repairs on the 3rd mainland bridge which is slated
to begin on the 1st of July and end in November 2012.
I remember the last time this happened, traffic was so heavy on Ikorodu
road that people had to leave the mainland and early as 4am if they
intend to get to the Island before 10am everyday.
I hope doesn't get that bad this time around. Welcome to the torture of that mad traffic (sing it like guaranty trust bank jingle lol)














0 comments:
Post a Comment
We Love To Hear What You think About The Post Or Blog.